“An education facility was experiencing slipping problems and tripping hazards to main walkways. The concrete pathway was worn and required extensive repairs for cracking. We worked with Antiskid to develop an appropriate solution considering required outcomes and site restrictions. Antiskid handled all aspects including creating a safe environment that was respectful of the staff and children. The Antiskid team were extremely professional and worked with all stakeholders to ensure that any interruptions or inconveniences were minimal and well communicated. The project was delivered as planned and the results are outstanding. All stakeholders are satisfied with the end result. We have no hesitation in recommending Antiskid on future projects.”
“Back of House areas (total around 5,000m2) was done in 3 or 4 different colours. All Trafficable areas were a light grey. Demarcation zones were done in a dark grey bordered with a yellow line. Demarcation zones are where the equipment for shows is stored during Bump-in, stage set-up and performance. Fire Hydrants and Extinguisher locations were hi-lighted with red diagonal lines. Truck loading Bay was painted the traditional Yellow and Black stripes. To finish off Antiskid installed 14 x ‘CAUTION FORKLIFTS OPERATED IN THIS AREA’ decals. The colour combinations look great, and the system works well”.
Eric Bentley - Building Works Manager, Perth ArenaMay 1, 2016
Perth Arena Stadium
“Antiskid Industries recently completed a floor resurfacing project at Perth Arena. The product they used was a Flowcrete Deckshield Polyurethane UV coating. The Bowl Floor 2600m2 was done in Sky Blue colour (RAL 5012) prior to Christmas 2014, and almost one year later and several high energy concerts, still looks like new”.
Eric Bentley - Building Works Manager, Perth ArenaApril 1, 2016
Attractive, hard wearing easily maintained flooring system
“These floors take a pounding from shows bumping in and out, constant forklift traffic, stage set-ups and removals, Basketball set-up, dismantle Mosh Pit activities and Hopman Cup Tennis activities. Antiskid has provided a great Product and Service which should last Perth Arena 5 – 8 years of a good hard wearing flooring surface. Antiskid Industries approach to the project by all staff was enthusiastic, respectful, and a great ‘can do’ attitude. I would not hesitate to recommend Antiskid Industries Pty Ltd, as a great Company to do business with”.
Eric Bentley - Building Works Manager, Perth ArenaMay 5, 2016
Nammuldi Below Water Table project
“Kerman Contracting Pty Ltd was very satisfied with the works undertaken by Antiskid Industries at the Rio Tinto – Nammuldi BWT project. The Antiskid site team did what was asked of them and accommodated the many interfaces without fuss. The finished works were of a high quality with all the works completed safely. Kerman would have no hesitation in using Antiskid on future projects”.